This evening I clecoed the vertical stabilizer rear spar doubler to the rear spar. I then clecoed all of the hinge brackets to the spar assembly. I then final drilled all matched holes in the assembly and hinge brackets and I and back drilled the the two holes missing from the pattern of the upper hinge bracket of the bottom hinge assembly (VS-410PP).