KitLog pro

Powered By Kitlog Pro v2.0

SEAN'S WEB SITE
' style=
Date:  9-1-2007
Number of Hours:  3.00
Manual Reference:  Sec. 6-8, DWG 5
Brief Description:  Dimpled, Deburred and Prepped left Elevator

I deburred the edges of all skins, spars, ribs and other parts of the left elevator assembly. I fitted all skeletal structure components together and clecoed the skeleton to the left elevator skin. I final drilled the assembly and took it apart. I then deburred all holes.

I used the pnuematic squeezer to dimple all stiffeners, rib flanges, spar, and the outside holes of the right elevator skin to #40.

I primed the contact side of the stiffeners with NAPA 7220 self-etching primer.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.