KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  10-4-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Tank Prep - Locate Right Tank 1

I put the right tank on the wing and moved it into position with zero gap between tank skin and leading edge skin. Then I drilled the inboard Z-bracket which firms up the location of the tank on the wing and gaurantees zero gaps.
' style=

No gap between tank and leading edge

No gap between tank and leading edge

' style=

Drill inboard z-bracket with #30

Drill inboard z-bracket with #30

' style=

Inboard Located

Inboard Located

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.