KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  3-31-2021
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Annual 2nd March 2021 1

Here are the things I addressed during this second annual:
1) New Brakes Pads
2) Packed Bearings, Front bearing is sealed
3) Reversed tires on rims
4) Wear spots on gear legs
5) Wear spots on cowl and filing down baffle aft corners
6) Revised jump wire to 8 AWG
7) Chip on ring gear

All cylinder pressures are good 76 - 79.
88.5 total tach hours
' style=

Getting ready for annual

Getting ready for annual

' style=

88.5 total tach hours

88.5 total tach hours

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.