KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  9-24-2009
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Aft Deck: Add elevator stop and bulkhead

While I'm working on the aft deck I checked the drawings and don't see any reason why not to drill and rivet on the elevator stop. So I clamped, drilled, primed and riveted the elevator stop to the aft deck.

And I also riveted the bulkhead on to the aft deck now. This is prior to riveting the aft deck to the fuselage. I riveted these two parts to the aft deck now because it is easier than doing them after riveting the aft deck to the fuselage.

I'm going to hold off riveting the aft deck to the fuselage.
' style=

Added the elevator stop

Added the elevator stop

' style=

Riveted on the bulkhead

Riveted on the bulkhead

' style=

Aft Deck Clecoed only

Aft Deck Clecoed only

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.