|
|
RV-7A Construction Log
|
Date: 12-1-2008
|
Number of Hours: 2.00
|
Manual Reference:
|
Brief Description: Tank Assy - Baffle Left Tank 1
|
|
First putting on the baffle is the hardest job so far in building this RV. I thought it would take 90 minutes. It took 5 hours. The steps are:
1) Get everything ready, Tools, Rivet squeezer and Gun, bucking bars, pulled rivet gun etc. 2) Get parts ready. Everything cleaned, MEKed, untouched, scuffed, skin, ribs, z-brackets rivets ready, baffle 3) Mix up Proseal and spread it on baffle, ribs, skins 4) Put baffle in place and cleco 5) Put z-brackets in place and cleco 6) Pop rivet baffle to ribs 7) Pop rivet z-brackets 8) Rivet gun end ribs to baffle 9) Squeeze a million rivets skin to baffle in the countersinks 10 ) Clean up
I made 88 grams of Proseal. Not enough. Needed 120. Modified cheap rivet puller. Worked ok.
|
|
View of tank ready to close
|
|
Modified rivet gun for z-brackets
|
|
I took photos of all the insides
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |