Powered By Kitlog Pro v2.0
RV-7A Construction Log
RV-7A
All
12-9-2016
< Previous Log Entry
Next Log Entry >
Date:
12-9-2016
Number of Hours:
1.00
Manual Reference:
Brief Description:
Cowl Instal 7 Fitting Upper Cowl
I put magazines on the engine to hold the upper cowl up and level with the spinner while I drilled the hinge holes.
I made the hinge holes match the holes on the fuselage hinge half, but I'll be filling in these rivets and painting them, so they won't show anyway.
the cowl was slightly low of spinner, but later when I drill the bottom cowl it ends up level with spinner.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
2101
1764
Avionics
60
53
Cert & Flying
62
75
Cowl
48
37
Electrical
61
48
Empennage
141
181
Engine
102
73
Finish Kit
255
148
Fuselage
339
238
Fuselage After Flip
385
237
Gear
78
57
Interior
16
14
Miscellaneous
49
33
Painting
62
50
Prop
17
17
Shop
5
10
Tools
59
24
Training Projects
12
32
Wings
350
437
Copyright © 2001-2024 Matronics. All Rights Reserved.