Started off my fixing the stiffener that was too long. Drilled out the rivets and placed a scrap piece under the stiffener and cut it down. Took a file and rounded, smooth out edges and hit it with a scotch bright pad. Reassembled and drilled out the Left Elevator.
Move on to the chore of deburring the elevators, starting with the deburring match drilled holes. Then moved to check and debur the edges and finally dimpled per plans. That took me to the end of the day.