Date:  7-6-2013
Number of Hours:  20.00
Manual Reference:  None
Brief Description:  Wiring, continued, big progress

I've spent the 4th of July holiday weekend wiring non-stop. I believe I have all wire run that needs to be, and I've added connectors to the harness end points and the components they go to. I didn't add connectors yet to parts I know will have to squeeze through tight places during installation. I sheathed most of it with heat-shrink wrap. This is about all I can do inside in the air conditioning, so I think the next step will be installation in the plane.
' style=

Connectors added to most end points

Connectors added to most end points

' style=

Relay for the control sticks trim switches

Relay for the control sticks trim switches

' style=

Sheaths installed...it's about ready for the plane

Sheaths installed...it's about ready for the plane

' style=