KitLog pro

Powered By Kitlog Pro v2.0

Project Blue Angels SeaRey
< Previous Log Entry          Next Log Entry >
' style=
Date:  1-23-2013
Number of Hours:  7.00
Manual Reference:  6.x, 18G.x
Brief Description:  Sections 6 + 18G, build, cover vert stabilizer

Build and cover the vertical stabilizer. Was putting this off as long as possbile, but really wasn't that bad. Covered, glued, ironed, taped, then applied two coats of Poly-Brush. Also went ahead and installed the drain plugs so they can be painted over.
' style=

Fabric on the tail, nice and tight.

Fabric on the tail, nice and tight.

' style=

After two coats of Poly-Brush.

After two coats of Poly-Brush.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.