Brief Description: Sections 6 + 18G, build, cover vert stabilizer
Build and cover the vertical stabilizer. Was putting this off as long as possbile, but really wasn't that bad. Covered, glued, ironed, taped, then applied two coats of Poly-Brush. Also went ahead and installed the drain plugs so they can be painted over.