KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  5-10-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Panel work

Finished drilling the instrument attachment clips, there are two on each side. The photos show the end state, but it was quite a process of removing enough clecos to be able to get a long drill into the upper clips, putting everything together again, checking the fit, removing clecos and drill next hole, repeat. Now everything comes apart for dimpling, deburring and priming. Monday should be rivet day.
' style=

Right side

Right side

' style=

Left side

Left side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.