Powered By Kitlog Pro v2.0
Sid & Houston Mayeux Project
RV-7A
All
9-18-2014
< Previous Log Entry
Next Log Entry >
Date:
9-18-2014
Number of Hours:
3.00
Manual Reference:
Oil Door
Brief Description:
Cowling oil door, part 4
After deburring/dimpling/countersinking the rivet holes and priming, I riveted the assembly including the camlocs.
However, I neglected to paint the panels first. I did that later with some really careful masking on the camlocs.
Primed, ready to rivet
All riveted, including the door-side hinge
Back-side view
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
720
1549
Avionics
20
48
Cockpit
49
135
Electrical
23
81
Empennage
138
279
Engine
65
181
Firewall Forward
43
92
Flight Controls
16
35
Fuselage
159
354
Landing Gear
38
82
Miscellaneous
47
48
None
6
1
Shop Supplies
5
18
Tools
1
3
Wings
91
192
Wrap Saga A - Dream
4
Wrap Saga B -- Victo
2
Wrap Saga C -- Petit
4
Wrap Saga D -- Fligh
4
Wrap Saga E -- Emerg
3
Wrap Saga F -- Home
2
Copyright © 2001-2024 Matronics. All Rights Reserved.