KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
' style=
Date:  7-29-2014
Number of Hours:  3.00
Manual Reference:  Baffles
Brief Description:  Baffle Walls, part 2

Houston and I went through the following process about 12 times before we called it good:
- install paperclips
- install top cowling
- remove top cowling
- measure the paperclips' height
- trim a little more off the top cowling here, there,
- repeat...
' style=

Measuring the paperclips' rise after removing the top cowling

Measuring the paperclips' rise after removing the top cowling

' style=

Gap is good all around

Gap is good all around

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.