Brief Description: SB 14-01-31 part 6, fabricating the main rib forwa
The SB kit included a length of 0.035" x 1" angle for fabricating new flanges to replace those we cut from the main ribs. I cut them to length, edge-treated, then bent them inward to the prescribed bend angle. I cleco-clamped them into place on both sides to ensure the bend angle was correct (both sides of the angle should sit flush against the rib and spar doubler faces.