KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
' style=
Date:  7-29-2012
Number of Hours:  2.00
Manual Reference:  Solenoids
Brief Description:  Drilling/installing starter and master solenoids t

Col Rich Donnelly helped me drill the pass-through holes into the firewall for the battery box and the master/starter solenoid doublers and nutplates. We riveted the doubler using the back-rivet method: That's me head-first in the cockpit foot well running the rivet gun. Rich bucked the rivet's flush factory head on the firewall's forward side with the tungsten bucking bar.
' style=

Mount doubler located, firewall drilled

Mount doubler located, firewall drilled

' style=

Back-riveting the doubler and platenuts

Back-riveting the doubler and platenuts

' style=

Solenoid in place, and diodes installed

Solenoid in place, and diodes installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.