KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
' style=
Date:  9-18-2011
Number of Hours:  3.00
Manual Reference:  Heater baffle
Brief Description:  Cockpit heat baffle drilling, assembly

Started assembly on the cockpit heater baffle and forward cockpit floor tunnel assembly, starting with matchdrilling, pass-through hole drilling, edge and hole debur and dimple, and priming.
' style=

Drilling baffle pass-through holes

Drilling baffle pass-through holes

' style=

Assembling, drilling the heat baffle

Assembling, drilling the heat baffle

' style=

Primed

Primed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.