SNOW DAY! Now I can get some stuff done. started out by sealing up the last two ribs. Riveting the nose stiffener with the attach backet was difficult but it all worked out. Mixed up 120 g of sealant, then need another 20 g for everything else. Moved on to the capacitive fuel senders that just needed to be installed. Then the vent tube bushings modified for the sender wire. Routed the wires, soldered and crimped them together. Sealed BNC connector. Was ready to call it a day because I couldn't flare the vent tube then I took a break and checked the mail...bam...the flare tool had arrived. Flared, installed and sealed the vent tube. Mixed up another 100 g of sealant. Installed and sealed the baffle and sealed and insalled the Z brackets. All that's left is to install the inspection cover and leak check.