KitLog pro

Powered By Kitlog Pro v2.0

Scot's RV-7A Builder's Log
' style=
Date:  11-8-2015
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Fuel Pump

Prepped and primed all the fuel pump cover parts. Spent the rest of the day mounting the fuel pump and filter, then bending the two lines, one from the selector valve to the filter and another from the filter to the pump. I'm not happy with how much space the forward line takes. It's about 1/4 inch from the front of the cover when installed. It's so long because the flare tool I have requires about an inch and another inch of line is required before the bend. Pushing the whole pump aft causes the electical connections to be about a half inch from the opening in the cover which I don't like. I put a piece of alligator teeth on the corner just in case.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.