Powered By Kitlog Pro v2.0
Peter's RV-7 Web Log
RV-7
Wings
5-6-2004
< Previous Log Entry
Next Log Entry >
Date:
5-6-2004
Number of Hours:
1.00
Manual Reference:
Brief Description:
Pressure Tested Left Tank
Connected a tube with water and a pressure valve to the left tankl and pressure tested teh tnak cover plates. (The rest of the QB tank was supposed to be already tested.) Everything held pressure overnight.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
121
409
Avionics
1
2
Empennage
48
154
Fuselage
36
124
Miscellaneous
1
Other
5
29
Wings
30
100
Copyright © 2001-2024 Matronics. All Rights Reserved.