KitLog pro

Powered By Kitlog Pro v2.0

Peter's RV-7 Web Log
Work Logs Found: 121
Category Work Time: 409 Hours
 Date
Hours
Work Log Summary

Details

 04-03-2021
0.00
Sold
Details

 05-05-2007
4.00
Installed NACA vents; Panel brackets
Details
       

 05-03-2007
4.00
Match drilled forward upper skin; panel brackets
Details
     

 05-01-2007
6.00
Finished front deck supports and panel frame
Details
       

 04-29-2007
4.00
More Front deck and Instrument Panel
Details
       

 04-28-2007
5.00
Trimmed front deck support ribs
Details
     

 04-23-2007
4.00
Back at it - Front deck
Details

 07-01-2006
2.00
Aft cockpit ribs
Details
       

 05-08-2006
4.00
Instrument Panel frame
Details

 03-24-2006
1.00
Ordered Affordable Panel kit
Details
     

 02-26-2006
4.00
Installed control tubes
Details
       

 02-24-2006
2.00
Finished up cockpit panels
Details
       

 02-21-2006
4.00
Flap motor installation
Details
       

 02-20-2006
3.00
Started flap motor installation
Details
       

 02-20-2006
2.00
Planning Panel
Details
       

 02-11-2006
3.00
Front cockpit panels
Details
       

 02-11-2006
2.00
EAA Chapter Visit
Details
       

 05-04-2005
2.50
Installed fuel valve
Details
     

 05-02-2005
2.00
Plumb Hi-Performance Fuel Pump
Details
       

 09-26-2004
2.50
Forward floor panels
Details

 09-19-2004
3.00
Forward floor panels
Details

 09-06-2004
3.00
High Pressure Fuel Pump
Details
       

 09-04-2004
3.50
Seat supports; ELT; static line
Details
       

 09-02-2004
3.00
Finished seats
Details
       

 08-16-2004
2.70
Started seats
Details
       

 08-14-2004
3.50
Forward tunnel cover
Details
     

 08-08-2004
4.60
Strobe pack; baggage floor conduit
Details
       

 07-25-2004
6.00
Top aft skin; baggage floor
Details
       

 07-24-2004
5.00
Elevator control rods
Details
       

 07-19-2004
6.00
F-705 Gussets & Tail Wheel Mount
Details
       

 07-17-2004
2.00
Fit Rudder Pedals; Tail Wheel
Details

 07-11-2004
8.00
Installed brake pedals; tail wheel
Details
       

 07-10-2004
2.00
Brake Pedals
Details
     

 07-07-2004
2.00
Brake pedals
Details
     

 07-06-2004
2.00
Installed gussets; brake pedals
Details
       

 07-05-2004
4.00
Spar web gussets
Details

 06-20-2004
2.00
Started fuselage
Details
       

 06-19-2004
4.00
Wingtips
Details
     

 06-14-2004
2.00
Wingtips
Details
     

 06-13-2004
6.00
Wing tips
Details
       

 06-11-2004
3.00
Attached Right Flap
Details
       

 06-06-2004
4.00
Attached Left Flap
Details
       

 06-05-2004
6.00
Attached Ailerons
Details
       

 05-31-2004
6.00
Rivetted left bottom wing skin
Details

 05-29-2004
6.00
Rivetted bottom right wing skin
Details
       

 05-25-2004
2.00
Second Nav light
Details
     

 05-23-2004
3.00
Solder LED Nav light
Details
       

 05-22-2004
3.00
Pitot tubing; Static ports
Details
       

 05-21-2004
1.00
Attached Flap braces
Details

 05-19-2004
2.00
Lower wing skins
Details

 05-17-2004
1.00
Attached Aileron Harware
Details

 05-09-2004
5.00
Prepared Lower Wing Skins
Details
       

 05-08-2004
2.00
Routed AOA tubes in wing
Details
       

 05-08-2004
1.50
Installed Pitot in wing
Details
       

 05-07-2004
1.00
Pressure tested Right Tank
Details
     

 05-06-2004
1.00
Pressure Tested Left Tank
Details
     

 05-02-2004
5.00
AOA; Fuel Tank Covers
Details

 05-01-2004
4.00
Landing Light; AOA Probes
Details

 04-29-2004
2.50
Aileron gap brace; started right light
Details

 04-28-2004
2.00
Installed left aileron gap brace
Details

 04-26-2004
1.50
Finished left landing light
Details
       

 04-25-2004
4.00
Installed Landing Light
Details
       

 04-24-2004
4.00
Back to work on the wings
Details

 01-11-2004
3.50
Aileron Brackets
Details

 01-04-2004
4.50
Push Tubes & Aileron Brackets
Details

 12-14-2003
5.00
Started Wings
Details
       

 11-08-2003
1.50
Fitted inserts for HS Tips
Details
       

 11-02-2003
2.00
Glued/rivetted elevator tips
Details
       

 11-01-2003
1.50
Drilled tips
Details

 10-26-2003
3.00
Preparing tips
Details

 10-19-2003
2.00
Fitting Elevator Tips
Details
       

 10-18-2003
1.00
Repainted elevator horn
Details

 10-14-2003
2.00
Redrilled Elevator horn
Details

 10-11-2003
5.00
Finished tab; Fitted elevators
Details

 09-28-2003
6.00
Elevator Trim Tab
Details
       

 09-21-2003
4.00
Left Elevator assembly
Details
       

 09-20-2003
2.00
Left Elevator Tabs
Details
     

 09-07-2003
3.00
Unload fuselage
Details
       

 09-06-2003
4.00
Unpacked Wings
Details
       

 09-06-2003
2.00
Dismantled Crate
Details

 09-05-2003
4.00
Picked Up QB
Details
       

 08-27-2003
7.50
Started Left Elevator
Details

 08-26-2003
1.50
Finished Leading Edge Right Elevator
Details
       

 08-25-2003
1.50
Rolled Right Elevator LE
Details

 08-22-2003
3.50
Rivetted Right Elevator
Details
       

 08-10-2003
6.50
Right Elevator
Details
       

 08-09-2003
5.50
Prepped Elevators and Primed
Details

 08-03-2003
3.00
Elevators
Details
     

 08-02-2003
5.00
Started Elevators
Details
     

 07-31-2003
4.00
Finished Rudder
Details
       

 07-29-2003
1.50
Glued Rudder Trailing Edge
Details
     

 07-26-2003
6.50
Rivetted rudder
Details
       

 07-25-2003
6.50
Rudder Skins; painted rudder pieces
Details
     

 07-22-2003
1.50
Deburred Rudder parts
Details

 07-15-2003
2.50
Rudder
Details

 07-14-2003
2.50
Match Drilled Rudder
Details

 07-13-2003
4.50
Assembled Rudder
Details

 07-09-2003
0.70
Started Rudder
Details

 07-09-2003
1.25
Finished VS riveting
Details
     

 07-08-2003
1.80
Riveted VS skin
Details
       

 07-07-2003
1.00
Finished VS assembly
Details

 07-06-2003
2.00
Assembled VS rear spar
Details
     

 07-05-2003
2.00
Prepped VS Components
Details

 07-01-2003
4.00
Started VS
Details

 06-28-2003
4.00
Finished HS
Details
       

 06-27-2003
2.00
Riveted HS
Details

 06-22-2003
8.00
Assembly of HS
Details
       

 06-21-2003
3.00
Painted HS components
Details
       

 06-19-2003
2.00
Prep & Alodine
Details
     

 06-15-2003
3.50
Dimpled HS skin
Details
       

 06-14-2003
5.00
Finished structure for HS
Details

 06-08-2003
7.00
Assembled and fit HS
Details
       

 06-07-2003
3.00
Front HS spar
Details

 06-01-2003
3.00
Front HS Spar
Details
       

 05-31-2003
4.00
HS rear spar
Details
       

 05-26-2003
1.00
Set up
Details
       

 05-25-2003
3.00
Finish Control Surface Project
Details

 05-24-2003
5.00
Build Practice Control Surface
Details

 05-17-2003
15.00
RV Builders Seminar
Details
     

 04-27-2003
2.00
Inventory
Details

 04-22-2003
0.10
Empennage Arrived










Copyright © 2001-2024 Matronics. All Rights Reserved.