Prepared elevator trim tab; bent tab ends. Drilled trim tab hinge, countersunk and dimpled. Riveted trim tab and trim cable horn; drilled trim tab hinge to elevator. Riveted trim tab hinge and elevator trim spar. Rolled left elevator leading edge. Attached rob end bearings. Elevators basically done except for fiberglass. Still need to be fit to horizontal stabilizer.