KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  3-31-2010
Number of Hours:  0.70
Manual Reference:  (none)
Brief Description:  Clecoed wiring bundles to side of fairings

1. Located 2 adel clamps on either side of side fairings. Stbd gets power bundle, port gets signal.
2. Drilled #40 holes for each of the four adel clamps.
3. Expaned holes to #30, and deburred.
4. Formed bundles with snap ties.
5. Installed adel clamps around each bundle, and clecoed in place.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.