Brief Description: Clecoed wiring bundles to side of fairings
1. Located 2 adel clamps on either side of side fairings. Stbd gets power bundle, port gets signal. 2. Drilled #40 holes for each of the four adel clamps. 3. Expaned holes to #30, and deburred. 4. Formed bundles with snap ties. 5. Installed adel clamps around each bundle, and clecoed in place.