KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  10-28-2009
Number of Hours:  0.80
Manual Reference:  6B8,6B9,6B10
Brief Description:  Riveted floor channels in place

1. Located pedal bearing channel 6B8-3, heel support 6B8-8, and floor stiffner 6B10-2.
2. Positioned pedal bearing channel on cabin floor 6B10-1.
3. Clecoed alternate holes, and holes to be clecoed with another assembly.
4. Set A4 rivets in holes.
5. Removed clecoes, except where rivets are to be set with another assembly.
6. Riveted remaining holes.
7. Repeated steps 2-6 for floor stiffner 6B10-2.
7. Repeated steps 2-6 for heel support 6B8-8.
' style=

units clecoed in place

units clecoed in place

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.