KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  10-18-2009
Number of Hours:  3.60
Manual Reference:  6DS2
Brief Description:  installed control connection on center spar.

1. Located previously drilled holes in center spar.
2. Place spar on bench, and worked AN3-6A bolts, washers, and nuts into place in 6DS2-3 uprights. Very tedious.
3. Primed control connection 6DS-2 with Rustoleum metal primer, then painted with Rustoleum black.
4. Opened outer hole of units 6DS2-1 for 6DS2-4 bushings.
5. Installed 6DS2-1s on 6DS2-3 uprights with AN3-5A bolts, associated washers, and locknuts.
6. Installed stbd end of control connection 6DS2-2 with washers and 6DS2-4 bushing.
7. Repeated step 6 for port end.
' style=

Lower nut holding upright in place

Lower nut holding upright in place

' style=

Stbd end of control connection as installed.

Stbd end of control connection as installed.

' style=

Overview of installed control connection

Overview of installed control connection

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.