Brief Description: installed control connection on center spar.
1. Located previously drilled holes in center spar. 2. Place spar on bench, and worked AN3-6A bolts, washers, and nuts into place in 6DS2-3 uprights. Very tedious. 3. Primed control connection 6DS-2 with Rustoleum metal primer, then painted with Rustoleum black. 4. Opened outer hole of units 6DS2-1 for 6DS2-4 bushings. 5. Installed 6DS2-1s on 6DS2-3 uprights with AN3-5A bolts, associated washers, and locknuts. 6. Installed stbd end of control connection 6DS2-2 with washers and 6DS2-4 bushing. 7. Repeated step 6 for port end.