KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  9-14-2009
Number of Hours:  1.50
Manual Reference:  6B14
Brief Description:  Opened holes around Gear attach, port and stbd

1. Checked fuselage alignment with laser and level. Minor corrections required.
2. Opened holes on stbd gear attach with #40 bit per dwg 6B14.
3. Opened other holes on stbd gear attach with 3/16" bit for AN3 bolt per dwg 6B14.
4. Repeated steps 2 and 3 for port side of aircraft.

Note to self: order a new 3/16" bit. Stainless steel takes a toll.
' style=

Laser checking fuselage alignment

Laser checking fuselage alignment

' style=

Opening holes with #20 bit

Opening holes with #20 bit

' style=

Completed hole enlargement

Completed hole enlargement

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.