1. Located gascolator A10580-T. 2. Drilled pilot holes in mounting tabs with #40 bit. 3. Positioned gascolator in mounting hole. 4. Back drilled through tabs with #40 bit, then back drilled with #20. 5. Installed outlet coupler F125-4B on forward face, using gasket sealer on threads. 6. Installed 90 degree inlet coupler on fact face, using gasket sealer on threads. 7. Removed sediment bowl, and placed gascolator in positon. 8. Clecoed in place. 9. Reinstalled sediment bowl, with quick drain rotated to face aft. 10. Installed fuel line on inlet and outlet.
Note: 90 inlet fitting had to be rotated horizontally, because of interferrence with dual sticks.