Brief Description: Prepare outside falshing for installation
1. Drilled pilot holes in outside flashing 6C3-4, using #40 bit. 2. Positioned on fuselage, and backdrilled into canopy arm. 3. Opened holes to #30. 4. Located lock position, and drilled holes. 5. Removed, deburred, and primed. 6. Located holes for canopy mount; drilled with #40 bit. 7. Opened holes with #30 bit. 8. Deburred, and countersunk holes.