KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  10-8-2010
Number of Hours:  3.10
Manual Reference:  6T0
Brief Description:  Priming and painting!

1. Removed protective plastic sheeting.
2. Wiped off dew.
3. Turned elevator over.
4. Cleaned off water spots, and installed servo closeout with A4 rivets.
5. Cleaned servo closeout with MEK.
6. Mixed additional primer.
7. Sprayed Elevator bottom with primer, and allowed to cure 4 hours.
8. Cleaned equipment.
9. Taped off areas to be painted red later on bottom of elevator.
10. Turned elevator over, and taped off areas to be painted red later.
11. Mixed white coating.
12. Sprayed white area on top of elevator.
13. Cleaned equipment.

Note: the coating may actually cure sooner, but I'm going to allow an over-night cure bafore turning the elevator ovewr, and painting the white area on the bottom.
' style=

Taping for the white coat

Taping for the white coat

' style=

Spraying the white coat on top

Spraying the white coat on top

' style=

Top with white coat

Top with white coat

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.