Date: 2-22-2012
|
Number of Hours: 2.50
|
Manual Reference: (none)
|
Brief Description: Installed starter and engine ground
|
|
No starter came with the engine, so I decided to use the Sky-Tec C12ST2/S, based on cost and weight tradeoffs. Installation was done, using the Continental IPB, page 2-21, and Sky-Tec furnished installation data.
When I built the aft fuselage section, I had installed a ground cable from the battery/external cable ground, and ran it to the engine compartment.
1. Cut ground cable and starter cable to length with pneumatic cutoff wheel. 2. Lugged #4 cables with #4 lugs. 3. Installed ground cable on bolt mounting starter to engine. 4. Installed gasket. 5. Mounted starter to crankcase, using flat washers, star washers, and a plain nut. 6. Torqued nuts per Continental limits table. 7. Installed starter cable on lug provided, and torqued per standard limits table.
Note: The bolts connecting the upper starter case to the engine have not yet been installed.
|
|
Starter positioned and cable cut to length
|
|
|
|
Torqueing the starter cable nut
|
|
|
|
|
|
|
|
|