Brief Description: Connected pilot and static lines to asi and alt
1) Removed old fitting from alt. 2) Fit nylo-seal plugs in asi and alt. 3) Connected pitot line to asi. 4) Installed nylo-seal "T" on end of static line. 5) Connected either end of "T" to asi and alt.
Note: The static line will eventually need another "T," as will the pitot line. The static line eventually feeds the encoding altimeter and the EFIS, and the pitot line feeds the EFIS.