Before I started to close up the floor, I did one more check. I was concerned about a wire that crosses under the rudder cable. I checked clearance and tugged at it to see if it would move under G load. I feel better that it wont chafe. I added anti-chafe tubing as well and it stiffened up the wire bundle. I started to rived the floor in. I used LP 4-3 pop rivets in the floor per the drawings.