Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
11-14-2009
< Previous Log Entry
Next Log Entry >
Date:
11-14-2009
Number of Hours:
3.00
Manual Reference:
8-77
Brief Description:
Flap intersection fairings
Bent the lower part of the flap fairings by hand to fit the fuselage bottom skin.
Re-checked the alignment of the ailerons and flaps and match drilled the fairings to the fuselage.
We had to open the bend on the RH fairing's flange that lies on the flap so that there is enough edge distance on the top row of rivets.
Bending the fairing
RH fairing match drilled
And LH fairing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
6
108
Canopy
2
288
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.