KitLog pro

Powered By Kitlog Pro v2.0

Richards Web Site
' style=
Date:  11-26-2005
Number of Hours:  7.00
Manual Reference:  L01
Brief Description:  Tubes and tires, main gear

Received replacement tires from Wicks, so I finally mounted the tires and tubes on the wheels. I bent the brake cable routing tubes to better point to the brake lever on the wheels. Drilled and riveted the cable guide in the spar box. Routed the brake cables. Also assembled the PTT switches in the Ray Allen control grips.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.