Brief Description: Pitot & Static line installation
The ‘Safe Air1’ kit for the pitot and static lines was brilliant and it came with enough bits and pieces to install all the tubing to the EFIS system. A modelling cutter, used for accurately cutting jet fuel pipe, was used to make all the cuts.