KitLog pro

Powered By Kitlog Pro v2.0

Robin's RV8 Web Site
' style=
Date:  6-1-2012
Number of Hours:  1.00
Manual Reference:  8.6 / 8.33
Brief Description:  Fuselage Final Assembly

The whole Fuselage had been assembled with clecos and taken apart and then prepared for the Final Assembly.

Starting with the Forward Floor and Landing Gear Box Assembly. The structure was held with the British Skin Pin Clamps. The American Clecos just are not accurate or powerful enough or accurate to hold this structure together. The Gear Bolts were inserted to make sure the assembly was as accurate as possible.
' style=

Landing Gear Box Ass.

Landing Gear Box Ass.

' style=

Forward Floor

Forward Floor

' style=

Start of Assembly

Start of Assembly

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.