Powered By Kitlog Pro v2.0
The Rosel Boys RV 8
RV-8
Fuselage
7-1-2014
< Previous Log Entry
Next Log Entry >
Date:
7-1-2014
Number of Hours:
3.00
Manual Reference:
Brief Description:
Horiz Stab Install
Fitted and shimmed and drilled bolt holes for horizontal stab to fuselage. Prior to drilling everything was checked with electronic level and tape measure. All set to 0 degree incidence to chord line of longerons and level to tail plate
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
208
1591
Avionics
12
189
Empennage
43
209
Engine
28
298
Fuselage
79
652
Miscellaneous
10
95
Shop Supplies
2
4
Wings
34
144
Copyright © 2001-2024 Matronics. All Rights Reserved.