KitLog pro

Powered By Kitlog Pro v2.0

The Rosel Boys RV 8
Work Logs Found: 79
Category Work Time: 652 Hours
 Date
Hours
Work Log Summary

Details

 01-17-2017
6.00
Upper/Lower gear leg fairings and pants
Details
       

 12-27-2016
10.00
Wheel pant prep/paint
Details

 12-19-2016
12.00
Canopy skirt prep/paint; Upper gear fairing
Details
       

 11-21-2016
3.00
Bleed Brakes
Details
     

 11-18-2016
18.00
Oil door/APU door
Details
     

 11-14-2016
0.00
Front windshield pics
       

 11-14-2016
60.00
Front windshield install
Details
       

 10-10-2016
10.00
Baggage door latch
Details
       

 09-23-2016
26.00
Top forward skin install/Wing tips/Fairings/Wing R
Details
     

 08-31-2016
26.00
Fiberglass fairings & Flap positioning system
Details
       

 08-15-2016
6.00
Missing fuselage screws installed!
Details
       

 06-24-2016
16.00
Wheel Fairing/Canopy Taxi Position Tab
Details

 05-03-2016
16.00
Flap positioning system
Details
       

 04-15-2016
12.00
Stick Grips
Details
       

 04-06-2016
23.00
Wiring install through bulkheads
Details

 02-26-2016
15.00
Air vent install
Details
     

 02-10-2016
10.00
Heater box
Details
       

 12-28-2015
8.00
Painting Interior
Details
       

 12-17-2015
8.00
Heat knob/Baffle Seal
Details

 09-30-2015
18.00
Cowling fit and finish
Details
     

 08-24-2015
14.00
Throttle Quads/Cowling Hinges
Details
       

 08-14-2015
12.00
Lower Cowling/Cowling Hinges
Details
       

 07-31-2015
12.00
Rear Throttle Quadrant
Details
     

 07-15-2015
12.00
Cowling Fit
Details
       

 04-18-2015
8.00
Wheel pants; Receive firewall forward kit
Details
     

 04-07-2015
4.00
Gear leg fairings
Details
       

 04-06-2015
8.00
Brake Lines
Details
       

 04-02-2015
4.00
Wheel Install
Details
       

 04-02-2015
0.00
Axle Alignment Pics
       

 03-17-2015
10.00
Canopy Latch
Details
       

 03-08-2015
6.00
Canopy rivet to frame
Details
       

 03-05-2015
9.00
Canopy
Details

 03-02-2015
6.00
Canopy skirt
Details
       

 03-01-2015
5.00
Canopy skirt
Details

 02-28-2015
4.00
Canopy
Details
       

 02-19-2015
5.00
Canopy skirt
Details

 02-16-2015
6.00
Canopy: Finish drill and Big Cut
Details
       

 02-07-2015
12.00
Canopy frame
Details
       

 02-04-2015
6.00
Canopy Rail
Details
       

 01-14-2015
2.00
Wings: Initial install
Details
       

 11-23-2014
2.00
EAA Inspection
Details

 11-11-2014
6.00
Baggage Door
Details
       

 10-23-2014
4.00
Fuselage Naca Scoop
Details
       

 10-20-2014
3.00
Windshield Support
Details

 10-19-2014
3.00
Fuse: control mount
Details
       

 10-13-2014
5.00
Fuse: Floor construction
Details
       

 10-12-2014
3.00
Fuse: Seatback
Details
       

 10-11-2014
4.00
Fuse: Seatback
Details

 10-09-2014
5.00
Fuse: Seatback assembly
Details
       

 09-15-2014
4.00
Forward Top Skin
Details
       

 09-01-2014
13.00
Aft Upper Skin Install
Details
       

 08-30-2014
4.00
Aft Upper Skin
Details
       

 08-29-2014
2.00
WD 814 Poor fit
Details
     

 08-20-2014
8.00
Aft Bulkheads
Details
       

 08-11-2014
2.00
Static System
Details
       

 08-09-2014
8.00
Brake Installation
Details

 08-01-2014
6.00
Fuel System and Vent Line Install
       

 07-30-2014
9.00
Fuel System Install
Details

 07-25-2014
16.00
Rear Rudder Assemby
Details
       

 07-23-2014
10.00
Brake and Rudder Assemby Contstruction
     

 07-22-2014
4.00
Brake and Rudder Assemby Contstruction
       

 07-21-2014
6.00
Brake and Rudder Assemby Contstruction
       

 07-18-2014
6.00
Rudder Install
Details

 07-17-2014
6.00
Control Arms
Details
       

 07-15-2014
6.00
Pushrod Assembly continued
Details

 07-14-2014
4.00
F840 & F841 Pushrod Assembly
Details

 07-13-2014
2.00
F-635 Bellcrank Assembly
Details

 07-11-2014
1.00
Vert Stab Continued
       

 07-09-2014
1.00
Vertical Stab install continued
       

 07-08-2014
6.00
Align and Install Vert Stab
       

 07-05-2014
6.00
Horizontal Stab align and install
Details
       

 07-01-2014
3.00
Horiz Stab Install
Details
       

 06-30-2014
5.50
Fuse: Floor
Details
     

 06-28-2014
4.00
Fuse: Floors
Details

 06-26-2014
4.00
Fuse: Floors
Details

 06-25-2014
5.00
Fuse: Seatbacks
Details
       

 06-05-2014
10.00
Fuse: Landing Gear
Details

 05-18-2014
4.00
Fuse: Landing Gear
Details
       

 10-20-2013
4.00
Fuselage: Delivery
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.