Powered By Kitlog Pro v2.0
The Rosel Boys RV 8
RV-8
Engine
5-24-2015
< Previous Log Entry
Next Log Entry >
Date:
5-24-2015
Number of Hours:
15.00
Manual Reference:
Brief Description:
Prop Gov/Alternator/EFII
Installed prop governor to engine with throttle cable bracket. Installed prop governor cable. Too long....ordered 49.5" from Vans and re-installed. Mounted B&C standby Alternator. Installed plane power alternator and EFII crank trigger
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
208
1591
Avionics
12
189
Empennage
43
209
Engine
28
298
Fuselage
79
652
Miscellaneous
10
95
Shop Supplies
2
4
Wings
34
144
Copyright © 2001-2024 Matronics. All Rights Reserved.