KitLog pro

Powered By Kitlog Pro v2.0

Randalls Web Site
' style=
Date:  8-11-2009
Number of Hours:  2.70
Manual Reference:  
Brief Description:  Control sticks and Ignition system

The right side control stick was installed and fastened in place with a 3/16" bolt and nut. The PTT Ray Allen hand grip was installed and the associated wiring was runout the bottom. The left hand controls(aileron and elevator)trim plus the PTT wre installed and wired out the bottom. Almost ready for Carlos to tie it together. I then ordered a brand new SDSEFI ignition controller and efi management system. Then I proceeded to remove the entire wire loom, coil, ecm and all other wires and connectors. All clean and ready for the new system. Should be here the first of next week. Wasted over 2 weeks screwing around with the original Eggenfellner (jerry-rigged) ignition system. My plane and my life are worth the upgrade. I will now have a package that I have COMPLETE faith in.
' style=

OEM ECM gone....

OEM ECM gone....

' style=

Engine loom gone....

Engine loom gone....

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.