Installed the center stick on the control tube. Riveted tube adaptor on the 6 foot elevator tube and install MM5 bearing. Install tube cover. Positionned and drilled the 2 angle pieces J-275 for the trim control. On the longer J-275 I riveted the small aluminium pieceJ-276 that hold the pulley.