KitLog pro

Powered By Kitlog Pro v2.0

Bob's Searey LSX Web Site
' style=
Date:  3-8-2015
Number of Hours:  1.00
Manual Reference:  Section 5
Brief Description:  Cutting and installing cockpit carpet

When I arrived at the hangar this morning it was -2C inside so I turned on the gas heat to see if I could get it up over freezing in case I got to the point later in the day to glue in the cockpit carpet.
Well, 5 hours later it was +14C inside, but outside it had also gone up by 10C so what I got for a pipeline load of natural gas I don't know.
Anyway it was a great feeling to cut the carpet and lay it out inside the cockpit area. A completely different skill set and tool kit required after hours spent installing the landing gear actuators inside the bulkhead frame.
But by the time I got it ready for gluing I had to entertain a hangar visitor over a brewski and despite the ambient temperature being perfect for gluing I decide to shut down for the day.
' style=

Laying out 98

Laying out 98"x59" piece

' style=

Cockpit carpet section cut out

Cockpit carpet section cut out

' style=

Cockpit carpet clamped in place

Cockpit carpet clamped in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.