KitLog pro

Powered By Kitlog Pro v2.0

Roberts Savannah VGW Web Site
' style=
Date:  3-7-2009
Number of Hours:  6.00
Manual Reference:  Ch 8
Brief Description:  Putting Horizontal Stab together

The first picture is of a part I will later drill out. The manual doses not do a good job helping to understand which end of the elevator cable needs to be facing where. I had it wrong, after looking and staring at various parts of the manual. and being positivce I was right.

I have been spending lots of time preparing the parts:
- De-burring the holes. I am using a counter sink tool mounted in my drill until a proper deburring tool arrives.
- Cleaning up the edges of the sheets and angles. They all have sharp edges, cut tabs/jagged edges. I have been filing each part carefully, trimming off the tabs and rounding off sharp corners.
- blowing with compressed air to get the shavings and chips away and wiping clean with acetone
- using the supplied corrosion inhibitor for all mating surfaces.
' style=

This will be coming out later and the cable fed through the other way

This will be coming out later and the cable fed through the other way

' style=

All cleaned up and ready to fit

All cleaned up and ready to fit

' style=

Test fit. Do it again and again. Always check three times before rivets

Test fit. Do it again and again. Always check three times before rivets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.