KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  4-24-2014
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Airbox inlet

Removed foam block and bondo. Rough-sanded inside and outside, applied glass tape and epoxy to outside of airtube, and epoxy and filler to inside.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.