KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  6-23-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Sand and alodine

Sanded the inside of the lower cowl; cleaned and alodined the 4 hinge strips.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.