KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  8-8-2014
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Mixture cable install

Installing the mixture cable, had to order one two inches longer than what came in Vans FWF kit.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.