Powered By Kitlog Pro v2.0
Ralph Finch RV-9A Build
RV-9A
Engine
5-4-2014
< Previous Log Entry
Next Log Entry >
Date:
5-4-2014
Number of Hours:
6.25
Manual Reference:
Brief Description:
Airbox, Oil cooler brace
Marked and ground away the flange for the airbox protruded into the Al indent, to make clearance for the mixture cable assembly.
Made the brace for the oil cooler, finally got it on the 3rd try. Gee I hate making multiple mistakes.
Made the backing strip for the right and left front upper-most baffles. Trimmed and drilled backing strip for left sides.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
785
2214
Canopy
62
162
Controls
22
40
Cowl
85
172
Electrical
54
134
Empennage
30
111
Engine
88
193
Firewall
20
45
Fluid Plumbing
44
138
Fuselage
175
560
Garage Setup
10
87
LdgGear/Wheels
11
18
Miscellaneous
25
90
Plumbing
44
138
Tools
1
2
Wings
114
324
Copyright © 2001-2024 Matronics. All Rights Reserved.