KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  4-23-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Airbox work

Trimmed the side of the airbox to fit the bulge for the mixture control. Fit and match-drilled the extra plate for the operational alternate air inlet. Bolted everything together after running a bead of hi-temp RTV.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.