KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  11-30-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Oil cooler

Reviewed prior oil cooler progress. Cut out rectangle in baffling for cooler, made 3 of the required 4 tube extensions for bolts (can't find my stock of tubing to finish the last one). Lots of time wasted looking for stuff.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.