KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  6-25-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Began fiberglass leading canopy edge

Began the fiberglassing of the forward edge of the tip-up canopy. Made a template for the epoxy/filler curve from Al to use as a scraper; taped canopy and Al with electrical and plumber's tape; roughend both canopy and Al with coarse sandpaper; made and pop-riveted tabs to Al to hold down canopy; applied a single fiberglass cloth with straight epoxy, then mix of epoxy and microballoons to form curve.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.