KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
' style=
Date:  10-5-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Finished adding jam nuts

Finished adding all the jam nuts to the 3 control rods, and re-touched up the zinc chromate on the elevator tube from control column to aft bellcrank, which was quite scratched.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.